US civil nuclear deal is in India's 'best interests', says noted scientist Anil Kakodkar

Quote:
"The country's nuclear programme is based on well thought out three-stage programme. The priority fuel available in the country for it is Thorium. First, we should begin with Uranium reactors and move on to Thorium by further developing the programme," he said.


Top
 Profile  
 
PostPosted: Feb 21, 2015 2:14 pm 
Offline

Joined: Apr 19, 2008 1:06 am
Posts: 2240
The most important part of benefit to India was import of uranium. The existing reactors are running at high load factors now. Russian reactors have been completed.
Other reactors have very high overnight costs and will only increase the power costs. The indigenous PHWRs are the most economic, at least in India. The building of these reactors should be scaled up and foreign reactors need be accepted only as sweeteners for uranium imports.
Conversions of indigenous reactors to high burn up thorium- plutonium or thorium-LEU fuel should be seriously taken up. It will result in creation of U-233. Fast reactors with metallic Th/U233 fuel could be thorium breeders.


Top
 Profile  
 
PostPosted: Aug 18, 2017 9:34 am 
Offline
User avatar

Joined: Nov 30, 2006 3:30 pm
Posts: 3353
Location: Alabama
India Commits to Fast Reactor Fuel Cycle Facility for U-233

Quote:
The first step of the three-stage program involves building indigenously engineered pressurized heavy-water reactors (PHWRs) and light-water reactors to produce plutonium. India recently announced it will build 10 700 MW PHWRs

The second stage uses fast-neutron reactors fueled by plutonium to breed U-233 from thorium. This is the focus of the current project.

In the third stage, the country will use advanced heavy-water reactors for power generation. They will be fueled with U-233 obtained from the irradiation of thorium in PHWRs and fast reactors.


Top
 Profile  
 
PostPosted: Aug 21, 2017 2:04 am 
Offline

Joined: Apr 19, 2008 1:06 am
Posts: 2240
There is one detail which could or should change in the three stage program as described.
A design of AHWR has been prepared but not built. The calandra design of PHWR could be used with half meter bundles of thorium fuel as designed. As a further evolution, a required fraction of bundles could be replaced by a thorium blanket, and a thermal breeder cycle introduced.


Top
 Profile  
 
PostPosted: Aug 22, 2017 1:05 pm 
Offline

Joined: Feb 28, 2011 10:10 am
Posts: 347
The AHWR is an interesting design, a self-breeder using the Th/U233 cycle and a cross between a HWR and a BWR. It is due to be constructed from 2018 onwards, according to the following article:

Fuel for India’s nuclear ambitions

The Kalpakkam fuel reprocessing facility is also interesting in this regard.


Top
 Profile  
 
PostPosted: Aug 24, 2017 7:12 am 
Offline

Joined: Apr 19, 2008 1:06 am
Posts: 2240
The AHWR is self sufficient in U-233 and needs additional plutonium or enriched Uranium. A blanket will have to be introduced for it to breed enough fissile.


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 21 posts ]  Go to page Previous  1, 2

All times are UTC - 6 hours [ DST ]


Who is online

Users browsing this forum: No registered users and 1 guest


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB® Forum Software © phpBB Group